News

fastfactsweb copyA brief overview of the New Maintenance Shop Project:

  • Space Allocation:

               - Main floor = 32,230 square feet

               - Second floor = 5,060 square feet

               - Mezzanine area = 1,100 square feet

  • Location: The alignment of the new building is in a north-south direction at the southwest corner of the existing shop in Sedgewick.
  • Construction Start: September 2017
  • Estimated Construction Completion: Summer 2018
  • Solar Power: The feasibility of installing a solar photovoltaic electrical system is currently being examined.

For more information, visit the following links: