Road Recovery Program

shoulderpulling

The Road Recovery Program is described as a process to rehabilitate a road structure, restore drainage and dispose of any rocks and regrowth of trees and shrubs. The Road Recovery Program is carried out by County resources and it includes the following maintenance procedures:

  • Shoulder Pulling: Is utilized on roads that are in excess of 10 metres wide. This program extends the life of the road and reduces maintenance costs. This program may include drainage improvements, culvert replacement, reshaping backslopes and sideslopes, re-compacting the sub-grade, re-establishing the road surface crown, including the road surface width that the road was originally constructed, and the disposal of any rocks or shrubs.
  • Sub-Grade Preparation: Is required on roads in which the sub-grade has lost its compaction. This maintenance procedure includes re-compacting the sub-grade, re-establishing the crown on the road surface, and incorporating Gravelock, a soil stabilization product, to strengthen the sub-grade. This maintenance process is applied to roads that are nine metres wide or less.

2018 SHOULDER PULLING PROJECTS

The following Shoulder Pulling Projects are scheduled for 2018:
(Gravelock, a sub-grade road stabilization product, will be applied to these roads.)

Location Miles Road Classification
NNW 34-42-12 Twp Rd 430 East 4.75 miles Arterial
NNE 32-42-13 Twp Rd 430 West 2.5 miles Arterial
NNW 23-44-16 Twp Rd 444 East 5.2 miles Local
NE 31-44-15 Rge Rd 155 South 3.4 miles Local
Oiled Roads Transitioning to Gravel
NNW 33-44-13 Twp Rd 450 East 6.0 miles Arterial
NNW 33-42-13 Twp Rd 430 East 3.0 miles Arterial
  Total 24.85 miles  

FUTURE SHOULDER PULLING PROJECTS:

Location Miles Road Classification
NNW 23-44-16 Twp Rd 444 East 5.0 miles Local
ENE 35-46-15 Rge Rd 151 South 4.0 miles Local
NNW 22-45-16 Twp Rd 454 East 4.0 miles Local
ENE 36-40-13 Rge Rd 130 South 4.0 miles Local
NE 08-45-16 Rge Rd 164 South 3.75 miles Local
ENE 36-41-16 Rge Rd 160 South 6.0 miles Local
ENE 33-44-10 Rge Rd 103 South 7.0 miles Local
NNW 22-43-16 Twp Rd 434 East 3.0 miles Local
NNW 07-44-15 Twp Rd 442 East 4.0 miles Collector
NNW 21-45-13 Twp Rd 454 East 6.0 miles Local
NNW 23-40-14 Twp Rd 404 East 2.5 miles Collector
ENE 35-42-13 Rge Rd 131 South 6.0 miles Local
ENE 33-42-14 Rge Rd 143 South 6.0 miles Local
NNW 22-42-14 Twp Rd 424 East 5.0 miles Local
ENE 36-42-12 Rge Rd 120 South 6.0 miles Local
ENE 33-41-10 Rge Rd 103 South 4.0 miles Local
NNW 08-41-10 Twp Rd 412 East 2.0 miles Local
NNW 29-40-10 Twp Rd 405 East 2.0 miles Local
ENE 22-42-14 Rge Rd 142 South 4.0 miles Local
ENE 31-42-14 Rge Rd 145 South 6.0 miles Local
ENE 12-42-15 Rge Rd 150 South 2.0 miles Local
ENE 07-44-16 Rge Rd 165 South 8.0 miles Local
ESE 13-45-17 Rge Rd 170 South 6.5 miles Local
NNW 24-44-15 Twp Rd 444 East 4.0 miles Local
NNW 31-45-16 Twp Rd 460 East 3.0 miles Local
ENE 12-46-16 Rge Rd 160 South 8.0 miles Collector
ENE 19-45-15 Rge Rd 155 South 4.5 miles Local
ENE 33-43-16 Rge Rd 163 South 6.0 miles Local
ENE 12-44-16 Rge Rd 160 South 8.0 miles Local
NNW 24-44-14 Twp Rd 444 East 3.0 miles Local
NNW 15-42-11  Twp Rd 423 East 6.0 miles Local
NNW 34-44-11 Twp Rd 450 East 6.0 miles Local
Oil Roads Transitioning to Gravel
ENE 34-40-13 Rge Rd 132 South 4.0 miles Local
ENE 34-41-15 Rge Rd 152 South 3.5 miles Arterial
NNW 35-42-16 Twp Rd 430 East 6.0 miles Arterial
ENE 12-45-15 Rge Rd 150 South 4.5 miles Arterial
NNW 10-45-16 Twp Rd 452 East 4.0 miles Local
ENE 07-42-12 Rge Rd 125 South 2.0 miles Local
ENE 20-43-11 Rge Rd 114 South 2.5 miles Arterial
ENE 11-45-14 Rge Rd 141 South 5.0 miles Local
ENE 20-45-12 Rge Rd 124 South 6.0 miles Arterial
  Total 192.75  miles  

 